top of page
All Posts


30% Back from the Feds. Free Power for 25 Years. The Case for Commercial Solar in Nova Scotia
Why should Nova Scotia businesses choose solar?
Alex Ross
Mar 300 min read


We Did the Math: EVs Win in Nova Scotia — Even With the New Levy
We put the full 5-year total cost of ownership for two Chevrolets - one EV and one gas to the test.
Alex Ross
Mar 250 min read


Roguneil Farm Solar
In 2025, Highmark Power delivered a 130 kW ground-mount solar array on Krinner ground screws for Roguneil Farm in Stewiacke, NS, producing about 160 MWh of clean power a year.

Alex Ross
Feb 52 min read


Mary’s Harbour Microgrid – Maintenance
Since 2022, Highmark Power has maintained the Mary's Harbour microgrid in Labrador: 189 kW solar, 669 kWh battery storage, hydro and diesel, displacing about 30% of diesel use.

Alex Ross
Feb 52 min read


South Canoe Wind Farm: High Voltage O&M
Since 2022, Highmark Power has provided high-voltage O&M at the 102 MW South Canoe Wind Farm in New Ross, NS, including HV cable splicing and load break elbow replacement.

Alex Ross
Jan 192 min read


Highmark Power Welcomes New Federal Investment in EV Charging Infrastructure
Pollution Probe’s CHARGED program receives $3.3M to accelerate clean transportation in Atlantic Canada — Highmark Power ready to deliver.

Alex Ross
Jun 18, 20252 min read


Highmark Power Recognized as 2024 Avetta Safety Star Recipient
Highmark Power is proud to announce that we have been recognized as a 2024 Avetta Safety Star recipient, an honor awarded to companies demonstrating exemplary safety performance and unwavering commitment to workplace health and safety.

Alex Ross
May 19, 20251 min read


Communauto Atlantic
In 2024 and 2025, Highmark Power installed 6 Level 2 EV chargers at Communauto Atlantic carshare sites across Halifax, including Scotia Square and The Curve.

Alex Ross
May 19, 20251 min read


Amazon DYH1
In 2025, Highmark Power and Aecon Green Energy Solutions installed 15 Level 2 fleet chargers at Amazon's DYH1 delivery station in Burnside Industrial Park, Dartmouth, NS.

Alex Ross
May 11, 20251 min read


Nova Scotia Power Fast Charging Network
Highmark Power built 5 of Nova Scotia Power's 180 kW ABB DC fast charging sites, in Windsor, Annapolis Royal, Yarmouth, Liverpool and Bridgewater, completed in 2026.

Alex Ross
Apr 28, 20251 min read


Glooscap Landing
In 2025, Highmark Power delivered the electrical scope for phase one of the Glooscap Landing microgrid: a 290 kW ground-mount solar array and 2 DC fast chargers, with Natural Forces Solar.

Alex Ross
Apr 13, 20251 min read


Halifax Water – Cowie Hill
In 2024, Highmark Power and Solar Ascent installed a 127.5 kW DC rooftop solar system at Halifax Water's Cowie Hill facility, estimated to produce about 145 MWh a year.

Alex Ross
Mar 17, 20251 min read


Halifax Regional Municipality (HRM) Charging Network
Since 2024, Highmark Power has delivered 12 public charging sites for the Halifax Regional Municipality with SWTCH Energy: 40 Level 2 chargers and 9 DC fast chargers so far.

Alex Ross
Feb 18, 20252 min read


Bayside Travel Centre
In 2024, Highmark Power delivered the electrical scope for the Bayside Travel Centre microgrid near Antigonish, NS: solar PV, battery storage and Level 3 EV fast charging, built with Natural Forces Solar.

Alex Ross
Feb 7, 20251 min read


Cape Breton Miner’s Museum
In 2024, Highmark Power built a 55 kW ground-mount solar system for the Cape Breton Miners Museum in Glace Bay, NS, offsetting about 46% of the museum's electricity use.

Alex Ross
Feb 1, 20251 min read


Electrify Canada Charging Network
From 2023 to 2025, Highmark Power built 6 Electrify Canada 350 kW DC fast charging sites across New Brunswick and Nova Scotia, with ClearBlue Infrastructure Group.

Alex Ross
Jan 23, 20251 min read


Highmark Power Celebrates Two Years
This month, Highmark Power Inc. is celebrating two years of pioneering clean energy projects across Atlantic Canada. Specializing in electric vehicle charging, solar PV, battery storage systems, and more, we are proud of our significant growth and the exciting upcoming projects that are driving the energy transition forward. We extend our heartfelt thanks to our clients and partners for their diligent collaboration and support over the past two years. Join us as we reflect o

Alex Ross
Jul 2, 20244 min read


Solar Installation Services Across Nova Scotia
Highmark Power has delivered solar installations across residential, commercial, and institutional sites throughout Atlantic Canada. These projects reflect a range of system sizes and site conditions, with each installation designed and built to support reliable performance, long-term energy production, and seamless integration with existing electrical infrastructure.

Alex Ross
Feb 4, 20241 min read


Scotia Square Mall EV Chargers
In 2023, Highmark Power installed 4 networked Level 2 EV chargers at Scotia Square Mall in downtown Halifax, NS, for SWTCH Energy.

Alex Ross
Jan 12, 20241 min read


AddEnergie Charging Network
Since 2022, Highmark Power has provided preventive and corrective maintenance for AddEnergie's FLO charging network across Nova Scotia, New Brunswick and PEI.

Alex Ross
Jan 2, 20241 min read
bottom of page
